Haris
  • Introduction of the Company

    An Introduction to the Company

     Heris Power Plant Company was founded on 21/08/2011 as a private joint stock company and registered under the number 411 253 of the Companies Registration and Industrial Property Office of Tehran.

     The main activity of the company is the design, construction and operation of Heris power plant, electricity generation, distribution and sale of electricity, investment in the purchase of power plants, participation in domestic and foreign tenders and projects for the construction of power plants and their implementation.

      This power plant is the first class F power plant of the projects implemented in the country.

    Power Plant Profile Table

    Capacity MW

     

    Efficiency (Percentage)

    Access Factor  (Percentage)

    year of operation

    500

     

    %58

    %90

    2019

     

     

     

  • CEO

    Mr  Majid Dabirian has been CEO  since 2021.

  • The combination of company’s shareholders and board members

    Composition of Shareholders, Members of the Board of Directors of the Company

    Row

     

    Name of shareholders

    Percentage of shares

    Representative on the Board of Directors

    Post

    1

    Sepah Bank Welfare and Future Insurance Institute

    35.99

    Saeed Nokhostin

    Chairman

    2

    Omid Taban Hoor Energy Management Company

    24

    Majid Dabirian

    CEO &Member

    3

    Tana Energy Management Company

    10

    Mousa Rafan

    Vice Chairman

    4

    Atieh Design and Thought Trading Company

    0.01

    Hasanali Taghizadeh

    Member

    5

    Alvand Power Plant Management Company

    30

    Amanollah Niknafs

    Member

     

  • Summary of the History and Current Status of the Power Plant

     The implementation phase of the Heris Combined Cycle Power Plant construction project with the aim of meeting the need for electricity and also transiting abroad began in 21/03/2015.

     The project implementation area of ​​700,000 square meters is located in Harris County in East Azerbaijan Province.

     The nominal capacity of the power plant is about 500 MW, with one gas unit and one steam unit of class F. It’s equipment has been purchased from the Italian company Ansaldo.

    The Efficiency of the Heris power plant is %58 higher than the approximate average.